३१ श्रावण २०८३, आइतबार | Sun Aug 16 2026

Transportation resumes along Narayangadh – Muglin road


८ श्रावण २०७४, आइतबार  

0
Shares

Chitwan, July 23: Transportation along the Narayangadh – Muglin route resumed at 4:30 am this morning after the removal of landslide debris at Kalikhola and Chepangdanda sections.

The vehicular movement came to a grinding halt after landslide cascaded down and the blocked the road on Saturday afternoon. The landslide struck 2.3 km south of Muglin.

The road was opened on a single lane after 8 pm last night and became fully operational only this morning, according to Chitwan’s Superintendent of Police (SP) Deepak Thapa.

Sagarmatha

प्रकाशित मिति : ८ श्रावण २०७४, आइतबार  ३ : ५६ बजे